Step One

Initial meeting. We want to be sure it’s a good fit for both of us. This is where we sit down and talk about the specifics of your site and our process. Based on the information we glean from your proposed site, such as setbacks, zoning, lot coverage details, environmental constraints and any other concerns, we’re able to select a plan that meets your needs. We then take that plan and discuss any modifications or specific options you’d like to make your house a home, producing a timeline from start to finish. Take your proposal and get back to us; no pressure.


Step Two

PERMITTING. The permitting portion is taken care of entirely by SHDB.  This phase consists of putting together your file, drawing the erosion control plan, site plan, and storm water conveyance plan.  These documents are then assembled into a permit packet to be submitted to the jurisdiction, adjusting and resubmitting as needed. 


Step Three

ON-SITE CONSTRUCTION. Construction and legal inspection occurs entirely at our facilities, with 4 stages of construction / inspection occurring over a 4 – 5 week period.

  • Framing and all rough in of mechanical, electrical and plumbing.

  • Siding, roofing, sheet-rock taping and ceiling trim.

  • Final coat of sheet-rock mud, interior mill-work and painting.

  • Cabinet and counter-top installation, finish trim and touch-up.